logo
  • Find Us

    Zhengzhou, China

  • Online Us

    24-hour service

  1. Home / 
  2. Imitation Stone Install

Imitation Stone Install

2019-9-17covering the entire back of the stone. By using gentle pressure and a slight wiggling action while applying the stone to the bedscratch coat, you will assure a good bond. The stone installation must achieve a minimum of 50 lbs. per sq. inch shear bond. All cuts should be installed with the cut facing away from the entrance.

Get A Quote
Imitation Stone Install
Products center

Hot Products

Our products sell well all over the world, and have advanced technology in the field of crushing sand grinding powder.

Your demand

Contact Information

Zhengzhou High-tech Zone, China

[email protected]

Copyright © 2020.Company name All rights reserved. Sitemap